This profile has not been translated into English yet. It is shown in French, the reference language (automatic translation tools in your browser can help). Legal statuses and counts are shown in English.

Portrait of ADNOC Gas

Portrait: Wikipedia en — See Wikipedia/Wikimedia source page · source

Gaz naturel / traitement / LNG / infrastructures énergétiques

ADNOC Gas

Fiche documentée couvrant 15 controverses, dont « Décret d'Abou Dhabi visant à valoriser le gaz associé » et « Création de la coentreprise ADNOC LNG ».

Your opinion of this profile

Profile No. 5472 · Updated on 26 September 2026

15Documented controversies
8Sources
0Formal charge · all time
0Conviction

I. Documented controversies

01

11 novembre 2024 ; réalisation attendue en 2028

Projet d'acquisition de 60 % de Ruwais LNG auprès d'ADNOC

Status not specified

Not yet available in English — French original shown.

ADNOC Gas annonce son intention d'acquérir auprès d'ADNOC 60 % de Ruwais LNG pour un coût attendu proche de 5 milliards de dollars, avec réalisation visée au second semestre 2028.

Last verified: 21 September 2026

02

février 2025

Placement secondaire et flottant porté à 9 %

No legal proceedings

Not yet available in English — French original shown.

Un placement secondaire de 3,1 milliards d'actions génère environ 2,84 milliards de dollars de produit brut et porte le flottant à 9 %.

Legal status — source text
Not applicable

Sources · 1

  1. [1]
    ADNOC GasFrequently Asked QuestionsHigh reliability

Last verified: 21 September 2026

03

10 juin 2025

Rich Gas Development Phase 1 : FID et 5 Md$ de contrats

No legal proceedings

Not yet available in English — French original shown.

ADNOC Gas prend la décision finale d'investissement pour la première phase du Rich Gas Development et attribue environ 5 milliards de dollars de contrats couvrant notamment Asab, Buhasa, Habshan et Das Island.

Legal status — source text
Not applicable

Last verified: 21 September 2026

04

2025

Contrats de 2,1 Md$ pour l'infrastructure d'alimentation LNG

No legal proceedings

Not yet available in English — French original shown.

ADNOC Gas annonce 2,1 milliards de dollars de contrats destinés à renforcer l'infrastructure d'alimentation en gaz de projets LNG.

Legal status — source text
Not applicable

Last verified: 21 September 2026

05

15 juillet 2024

ESTIDAMA : nouveaux contrats et transfert de propriété à ADNOC

No legal proceedings

Not yet available in English — French original shown.

ADNOC Gas attribue environ 550 millions de dollars de contrats EPC pour une nouvelle phase d'ESTIDAMA. La propriété du projet, annoncé à environ 2,4 milliards de dollars, est transférée à ADNOC tandis qu'ADNOC Gas continue à gérer et exploiter le réseau.

Legal status — source text
Not applicable

Last verified: 21 September 2026

06

14 novembre 2024

Contrat LNG de dix ans avec GAIL India

No legal proceedings

Not yet available in English — French original shown.

ADNOC Gas conclut avec GAIL un contrat LNG de dix ans portant sur environ 0,52 million de tonnes par an à compter de 2026.

Legal status — source text
Not applicable

Last verified: 21 September 2026

07

1 janvier 2023

Constitution opérationnelle d'ADNOC Gas par consolidation

No legal proceedings

Not yet available in English — French original shown.

ADNOC Gas devient opérationnelle le 1er janvier 2023 en consolidant les activités de traitement du gaz et de LNG d'ADNOC ; l'entreprise annonçait environ 10 milliards de pieds cubes standard par jour de capacité et plus de 3 250 km de pipelines.

Legal status — source text
Not applicable

Last verified: 21 September 2026

08

mars 2023

Introduction en Bourse d'ADNOC Gas

No legal proceedings

Not yet available in English — French original shown.

L'IPO d'ADNOC Gas porte sur 5 % du capital et lève 2,5 milliards de dollars avant la cotation sur l'Abu Dhabi Securities Exchange.

Legal status — source text
Not applicable

Sources · 1

  1. [1]
    ADNOC GasFrequently Asked QuestionsHigh reliability

Last verified: 21 September 2026

09

2013

Integrated Gas Development

No legal proceedings

Not yet available in English — French original shown.

Le programme Integrated Gas Development relie et intègre davantage les flux offshore et le traitement onshore d'Abou Dhabi.

Legal status — source text
Not applicable

Sources · 1

  1. [1]
    ADNOC GasOur Company / heritage timelineHigh reliability

Last verified: 21 September 2026

10

1993

Extension de Das Island avec le Train 3

No legal proceedings

Not yet available in English — French original shown.

La mise en service du Train 3 de LNG à Das Island en 1993 augmente la capacité de liquéfaction de l'activité historique.

Legal status — source text
Not applicable

Sources · 1

  1. [1]
    ADNOC GasOur Company / heritage timelineHigh reliability

Last verified: 21 September 2026

11

1981–1982

Développement du traitement onshore à Habshan et Bab

No legal proceedings

Not yet available in English — French original shown.

La production gazière onshore débute en 1981 et les installations de traitement d'Habshan et Bab sont inaugurées en 1982 selon l'historique du groupe.

Legal status — source text
Not applicable

Sources · 1

  1. [1]
    ADNOC GasOur Company / heritage timelineHigh reliability

Last verified: 21 September 2026

12

1978

Création d'ADNOC Gas Processing

No legal proceedings

Not yet available in English — French original shown.

La coentreprise ADNOC Gas Processing est créée en 1978 pour développer le traitement du gaz onshore, activité ensuite consolidée dans ADNOC Gas.

Legal status — source text
Not applicable

Sources · 1

  1. [1]
    ADNOC GasOur Company / heritage timelineHigh reliability

Last verified: 21 September 2026

13

1977

Première production de gaz et première exportation de LNG des Émirats

No legal proceedings

Not yet available in English — French original shown.

La chronologie officielle place en 1977 la première production de gaz aux Émirats et la première cargaison de LNG exportée depuis Das Island.

Legal status — source text
Not applicable

Sources · 1

  1. [1]
    ADNOC GasOur Company / heritage timelineHigh reliability

Last verified: 21 September 2026

14

1973

Création de la coentreprise ADNOC LNG

No legal proceedings

Not yet available in English — French original shown.

ADNOC LNG est créée en 1973 comme projet pionnier de LNG dans la région et constitue une lignée d'activité ultérieurement intégrée à ADNOC Gas.

Legal status — source text
Not applicable

Sources · 1

  1. [1]
    ADNOC GasOur Company / heritage timelineHigh reliability

Last verified: 21 September 2026

15

1970

Décret d'Abou Dhabi visant à valoriser le gaz associé

No legal proceedings

Not yet available in English — French original shown.

L'historique d'ADNOC Gas situe en 1970 un décret de Sheikh Zayed visant à mettre fin au torchage inutile du gaz associé et à développer sa valorisation.

Legal status — source text
Not applicable

Sources · 1

  1. [1]
    ADNOC GasOur Company / heritage timelineHigh reliability

Last verified: 21 September 2026

II. Constellation of documented links

Each link refers to an imported relation or to a documented mention in a profile. A documented mention does not, on its own, prove a personal relationship.

List of documented links
  1. Future1 reference
    • Mentioned in “Projet d'acquisition de 60 % de Ruwais LNG auprès d'ADNOC” — ADNOC Gas's profile cites Future.

III. Your opinion of this profile

One opinion per browser, which you can change at any time. It rates the quality of the profile, not the person.

IV. Has something changed?

A new court decision, a missing source, a mistake? Tell us what should be updated: every request is read by the editorial team.